About Parkford Suites Legazpi:
 

Parkford Suites Legazpi reveals residences with a dynamic view of parks and the city — linking home and community, leisure and work, health and well-being. It’s a contemporary address where natural and urban spaces meet. 

Parkford Suites Legazpi is a highly connected residential community within walking distance of the Makati CBD,  Ayala Center, cultural spaces and educational institutions, and leisure destinations, embraced by green urban environments Washington SyCip and Legazpi Active Park. It is easily accessible via major road networks in Makati and the metro.

Project address: Legazpi Village, Makati, Metro Manila, Philippines 

Completion date: Q1 2026
Project Developer: Alveo Land Corp.
Project Manager: Alveo Land Corp.

HLURB LS No. 035150

Ad Approval No.: HLURB AA-2019/10-2576

About MAKATI

 

Makati lies within one of the most prestigious centers in Metro Manila. As the Philippines financial hub, Makati City hosts a lot of high value institutions and businesses as well as exclusive residential districts with one of the most highest real estate values in the country. 

Avida has been one of the emergent real estate developers in Makati City since 2007 with its four thoughtfully-designed projects to date – Avida Towers Makati West and Avida Towers Asten in Yakal/Malugay Sts., Avida Towers San Lorenzo in Chino Roces, and One Antonio in San Antonio Village.

6 Key nodes OF AYALA LAND

Ayala land bolsters Makati as the city that makes it all happen by investing in more then PhP 125 billion (USD 2.8 billion) in the Make It Happen, Make It Makati redevelopment campaign.

A game-changing program spread across six unique nodes for work, lifestyle, leisure, transport, corporate creativity, and entertainment.

MAKATI INTRA-CITY SUBWAY

 

Is an under-construction underground rapid transit line to be located in Makati, Metro Manila, that will link establishments across the city’s business district. It will be built under a public-private partnership program between the Makati City Government and a private consortium, led by Philippine Infradev Holdings. Proponents of the subway are expected to begin construction by December 2018 and it is expected to be completed by 2025

Project INFORMATION

 

  • With 35 total amount of floors (including roof deck)
  • With a total of 163 units
  • 7 units per floor (Typical Residential Floor)
  • 1 basement, and 8 podium parking.
  • With a turnover date of Q1 2027 (tranche 1)

PROJECT LOCATION

AMENITIES

  • Lap Pool
  • Gym
  • Kid’s Play Area
  • Kiddie Pool,
  • Function Rooms

Typical FLOOR LAYOUT

Typical UNIT LAYOUT